Maps and Records

Construction Plans


Plan # Description Film Roll Scanned
U-2023-020 Offsite Improvement Plans for U-Haul Warehouse at 3801 N Runway Drive (PIA) at NW corner of Runway Drive and Highway Drive - Includes new Driveways, Curb, Asphalt, ADA Ramps, and approximately 1350' feet of new sidewalk - (Baker & Associates) No
U-2023-019 Proposition 411 Residential 2023 Package 6 - Silvercroft & El Rio Acres - includes new asphalt, curb, sidewalk, and ADA ramps, Treatment is 2" mill & overlay PAG 2 mix, Located within Sec 03, T14S, R13E, G&SRM, Pima County, Arizona - (COT) Yes
U-2023-018 Proposition 411 Residential 2023 Package 5 - Harold Bell Wright Estates - includes new asphalt, Treatment is 1.5" mill and replace with PAG 2 mix - on Barbara Worth Drive, Marta Hillgrove, Natachee Avenue, Printer Udell Street, Corinth Avenue, Brian Kent Street, Shepherd Hills, and Wilmot Road Frontage, Located within Sec 07, T14S, R15E, G&SRM, Pima County, Arizona - (COT) Yes
U-2023-017 11th Avenue and Flores Street Green Storm Water Infrastructure Improvements - including chicanes with vegetation along Flores St and narrowing of the road with curb removal and vegetation areas on 11th Ave north and south of Flores St, also includes new asphalt, curb, header curb, irrigation, and proposed road closures with bollards - (Kimley > Horn) No
U-2023-016 Offsite Paving Improvement plans for First Avenue & Limberlost Drive - at southwest corner of intersection - includes new turn lanes, driveways, storm drains, pipe runs, asphalt, curb, ADA Ramps, and sidewalk with fire hydrant and traffic pole relocation - (Atwell) No
U-2023-015 Prudence Road Improvement Plan for Black Rock Coffee - Broadway Star (PIA) - at northeast corner of Prudence Road & Broadway Boulevard, includes new curb, asphalt, sidewalk, ADA ramps, scupper and sewer flow monuments - (Dynamic Civil Designs) No
U-2023-014 Proposition 411 Residential 2023 Package 4 - Julia Keene Neighborhood, Includes New Asphalt, Curb, Sidewalk, Speed Humps, and ADA ramps, Treatment is 1.5" to 2" Mill & Fill, PG 76-22TR+, Located within Sec 21, T14S, R14E, G&SRM, Pima County, Arizona (COT) Yes
U-2023-013 Proposition 411 Residential 2023 Package 3 - Halcyon Acres & Hermosa Hills Estates, Includes new asphalt, curb, sidewalk, and ADA ramps, Treatment is 2" Mill & Fill, PG70-10, Located within Sec 15, T14S, R15E, G&SRM, Pima County, Arizona (COT) Yes
U-2023-012 Proposition 411 Residential 2023 Package 2 - Jefferson Parks, North University, and Flowing Wells locations - includes new asphalt, curb, sidewalk, and ADA ramps, Treatment is 2" mill with PAG 2 70-10 fill, Located within Sec 34 and 35 , T13S, R13E, and Sec 6, T14S, R14E, G&SRM, Pima County, Arizona (COT) Yes
U-2023-011 Proposition 411 Residential 2023 Package 1 - Jefferson Park Addition, Shelton Addition, Fort Lowell Estates, Fort Lowell Meadows, Phillips Addition, Kapsal Addition, Strunk Addition No 1, Warsaw Addition No 2, Michelle Meadows, Venice Addition, Green Valle Addition, Monte Vista, Glenn Vista Addition, Wright Addition, Corner Stone Homes Subdivision, Los Nidos, Catalina Farms Annex, Fair Oaks Terrace, Bonita Vista Addition, Desert View Addition, and El Pasadena Tract - includes new asphalt, curb, sidewalk, ADA ramps, and modified speed humps, Treatments vary of chipseal for Jefferson Park & Shelton or 3/4" mill with 1/2" chip with a micro-surface elsewhere, Located within Sec 27 and 34 , T13S, R14E, Sec 12, T14S, R13E, and Sec 6, T14S, R14E, G&SRM, Pima County, Arizona (COT) Yes
U-2023-010 5th Street - 6th Street walkability improvements from Campbell Avenue to to Alevernon Way - includes new sidewalk, ADA ramps, drive ways, and streetlighting - (Kimley > Horn) No
U-2023-009 Underground Solar Electrical Conduit Plans for City of Tucson Santa Rosa Recreation Center - on La Paz Street between 10th Avenue and Osborne Avenue - (Solon) NOTE: Also see plan P-2023-001 No
U-2023-008 HAWK Pedestrian Signal at Oracle Road and Alturas Street, Improvements include a Pedestrian Activated Signal, and New Signing and Pavement Markings - (Kimley-Horn) Yes
U-2023-007 The Place at Mason Ranch Apartments - Phases 1 & 2 - including new curb, driveways, ADA ramps, sidewalk, and asphalt on Bear Canyon Road, and new sewer connection on Tanque Verde Road - (Baker & Associates) No
U-2023-006 Encantada at La Estancia Wilmot Road Improvement Plans - at the SE Corner of Camino Boleadoras & Wilmot Road - includes new right-turn new on Wilmot Road and driveways on Wilmot Road and Camino Boleadora with new asphalt, curb, sidewalk, and ADA Ramps - (Bakes & Associates) No
U-2023-005 Road Recovery Proposition 101 Rehabilitation Package 13 Park Avenue from 18th Street to 36th Street, includes reconstruction of roadway with new ADA ramps - (Kimley>Horn) No
U-2023-004 Offsite Improvement Plan for TEP DEMOSS PETRIE 138kv Substation at 2501 N Flowing Wells Road - between Gelnn Street and Grant Road - including new roadway asphalt, new concrete along the sides of the roadway, and new driveway - (Cypress Civil) No
U-2023-003 Church Avenue Complete Streets - 6th (Sixth) Street to Cushing Street - (PSOMAS) No
U-2023-002 Offsite Public Sewer Plans for Encatada at La Estancia across Wilmot Road from the east south of Los Reales Road / Camino Boleadoras - for proposed apartments at the SE corner of Camino Boleadoras and Wilmot Road - (Baker & Associates Engineering) NOTE: See Also PLAN NO G-2023-### No
U-2023-001 Road Recovery Proposition 101 Rehabilitation Package 10 (Downtown) - includes mill and replace or full road reconstruction with new curb, sidewalk, ADA Ramps, and speed humps for Stone Avenue from 1st Street to Broadway Boulevard (Excluding Downtown Links project), Franklin Street from Granada Avenue to Stone Avenue, Alameda Street from I-10 termination to Tool Avenue, Pennington Street from Congress Street to Stone Avenue, and Main Avenue from Cushing Street to 18th Street and then continuing as 10th Avenue to 19th Street - (Kimley > Horn) No
U-2022-027 Offsite Public Sewer Plans for The Place at Mason Ranch Apartments - behind curb on the south-side of Tanque Verde Road west of Bear Canyon Road - (Baker & Associates Engineering) NOTE: See Also COT PLAN NO G-2022-002 (COT DTM Internal Plan Number ONLY) NOTE: G-2022-056 (Official Pima County Plan Number) Yes
U-2022-026 Offsite Improvement Plans for portion of Mortimore Addition (Lots 1-12) - including new asphalt, curb, sidewalk, driveways and ADA ramp along Nabraska Stravenue and new sidewalk, driveways and ADA ramp along Madison Stravenue - (Kaeko) No
U-2022-025 Broadway Boulevard - Jessica Avenue Intersection ADA Ramp Improvements - including new curb, driveways, sidewalks and ADA Ramps, and also includes removal of some existing pedestrian push button poles - (WSP) No
U-2022-024 Camino Boleadoras at Kolb Road Intersection Traffic Signal and Striping Plans - (Southwest Traffic Engineering, LLC) No
U-2022-023 Camino Boleadoras at Wilmot Road Intersection Traffic Signal and Striping Plans - (Southwest Traffic Engineering, LLC) No
U-2022-022 Offsite Improvement Plans for Brake Masters - Grant Road and Swan Road - Repaving of North Street - (Cypress Civil) No
U-2022-021 Downtown Links Fiber System - 6th Street Underpass to Broadway Boulevard - (Kimley>Horn) NOTE: Also Plan Number P-2022-003 No
U-2022-020 Willard Street Improvement Paving Plans - western half of the street between Magnolia Avenue and Beverly Avenue - includes new AB and asphalt with thicken edges - for Bellevue Common Lots 1-4 in-fill Subdivision, Sequence #: 20190110448 - (ALR Engineering, Inc) No
U-2022-019 Public Street and Roadway Improvement Plans for Quicktrip Store #1499 - on the Northwest corner of Valencia Road and Valencia Crossing Drive - includes new turn lane, grate-style catch basin, underground storm drain pipe, asphalt, curb, sidewalk, ADA ramps, and driveways - (WLB) No
U-2022-018 Proposition 101, Residential Package 8 - Centennial Park No. 3, Estes Park, Blue Ridge Estates No. 2 & 3, Valley View East No. 5, 6, & 7, Containing Cooper Street, Evelyn Avenue, Antietam Place, Monitor Place, Merrimac Place, Chickamauga Street, Gollub Road, Kirckpatrick Circle, McClellan Street, Porter Avenue, Bluefield Street, Staunton Drive, Bluefield Street, Kenyon Drive, Millett Drive, Front Royal Drive, Blacksburg Avenue, Ames Place, Charlotte Avenue, Clinton Avenue, Toronto Street, Fayette Street, 45th Street, Lakeside Drive, Victoria Drive, Nicaragua Drive, Vancouver Drive, Perth Place, Chesin Drive, Seattle Drive, Portland Drive, Marvin Place, Barrow Street, Barrow Place, Bellingham Place, Bellingham Drive, Located within Sec 15 & 29, T14S, R15E, G&SRM, Pima County, Arizona (COT) Yes
U-2022-017 Proposition 101, Residential Package 7, Ward 3 - Mesa Verde Subdivision, Collen Subdivision, Miracle Manor, Miracle Mile Addition, Coronado Heights, Valenzuela Lots, Balboa Casitas, Coronado Heights Resubdivision, Leah Heights, Pueblo Norte, Coronado Villas, Geronimo Village, Jacinto Plaza Subdivision, Containing Glaris Avenue, 15th Avenue, 14th Avenue, Laguna Street, Florence Street, Vanover Road, Kelso Street, Tipton Drive, Jacinto Street, Fairview Business Park Place, Paris Prominade, Alturas Street, Budmoore Terrace, McIver Place, Balboa Avenue, Castro Avenue, Fritz Drive, Flavia Place, Dahil Road, Birdman Drive, Estrella Avenue, Fontana Avenue, Geronimo Avenue, Los Altos Avenue, Second Avenue, Delano Street, Blacklidge Drive, Laguna Street, Placita Estrella, Fontana Place, Amphitheater Place, Amaro Place, Incas Place, Cortez Place, Hopi Place, York Place, Leah Place, Geronimo Bluff Loop, Water Street, Wilcox Lane, Located within Sec 35 & 36, T13S, R13E, G&SRM, Pima County, Arizona (COT) No
U-2022-016 Proposition 101, Residential Package 6 - Fairmount Addition, Casa Bonitas Subdivision, Speedway Addition, Containing Forgeus Avenue, Sawtelle Avenue, Treat Avenue, Geneva Place, Lisbon Place, Toledo Place, Bentley Avenue, Harris Avenue, Stewart Avenue, 7th Street, 8th Street, 9th Street, 10th Street, Calle Glorietta, Via Rotunda, Sycamore Boulevard, Louis Lane, Justin Lane, Bryant Avenue, Louis Avenue, Desmond Avenue, Walnut Boulevard, Lee Street, Fairmount Street, Mabel Street, Bellvue Street, Dryden Lane, Harley Street, Elida Street, 44th Street, Cottonwood Lane, Located within Sec 3 & 8, T14S, R14E, Sec 26, T14S, R13E, G&SRM, Pima County, Arizona (COT) No
U-2022-015 Ward 6, Fiscal Year 2022 Road Repair Rehab Program - Plumber & Steward's Addition Subdivision, Rincon Court Subdivision, Old World Addition Subdivision, and Barnes Subdivision, Palo Verde Addition, Palo Verde Addition No. 2, McClendon Additition, Santa Catalina Subdivision, Sunshine Vista Subdivision, Bethanie Heights Subdivision, and Alvernon Terrace Subdivision, Containing Highland Avenue, Vine Avenue, Rincon Avenue, Warren Avenue, Cherry Avenue, Elm Street, Lee Street, Adams Street, Drachman Street, Mabel Street, Helen Street, Richey Boulevard, Calle Ricardo, Chrysler Drive, Dodge Boulevard, Baxter Drive, Winstel Boulevard, Rosemary Drive, Elaine Boulevard, Tearney Drive, Gerald Street, Edison Street, Hampton Street, Ryan Drive, Edison Place, Seneca Street, North Street, Located within Sec 4 & 6, T14S, R14E, G&SRM, Pima County, Arizona (COT) No
U-2022-014 Ward 5, Fiscal Year 2022 Road Repair Rehab Program, Containing Minorka Road, White Rock Avenue, Milton Road, Jeanette Boulevard, Euclid Avenue, Tyndall Avenue, 37th Street, 38th Street, 39th Street, Liberty Avenue, San Fernando Avenue, Located within Sec 30, T14S, R14E, Sec 6 & 7, T15S, R14E, Sec 1 & 12, T15S, R13E, G&SRM, Pima County, Arizona (COT) No
U-2022-013 Ward 4, Fiscal Year 2022 Road Repair Rehab Program - Lincoln Ridge Estates Subdivision, Saguaro Canyon Subdivision, Containing Avenida De Las Palmas, Desert Spring Street, Desert Aire Street, Desert Palm Street, Pomegranate Street, Keystone Road, Wellington Drive, Heritage Place, Overland Ridge, Chatam Ridge, Bridgestone Place, Breckinridge Drive, Elkridge Drive, Bayport Place, Elkridge Place, Laredo Court, Barrington Place, Located within Sec 33 & 36, T14S, R15E, G&SRM, Pima County, Arizona (COT) No
U-2022-012 Ward 3, Fiscal Year 2022 Road Repair Rehab Program - Monterey Addition Subdivision, Containing Fremont Avenue, Santa Rita Avenue, Edison Street, Hampton Street, Seneca Street, Waverly Street, Linden Street, Lester Street, and Chauncey Lane, Located within Sec 6, T14S, R14E, G&SRM, Pima County, Arizona (COT) No
U-2022-011 Ward 2, Fiscal Year 2022 Road Repair Rehab Program, - Desert Steppes Estates Subdivision, Acacia Park Subdivision, and Hidden Hills Subdivision, Containing Cooper Place, Koralee Place, Desert Steppes Drive, Julia Street, Timrod Street, Malvern Place, Hayne Place, Kent Place, Seneca Street, Evelyn Avenue, Linden Street, Fountain Park Drive, Chauncey Street, Lester Street, Wrightstown Place, Waverly Street, Goebel Avenue, Helen Place, Bellvue Place, Mabel Place, Fairmount Place, Calle Bolivar, Lee Circle, Lee Place, Calle Bogota, Lee Lane, Bogota Place, Sarnoff Place, Sarnoff Drive, Lee Street, Dennis Avenue, and Pima Street, Located within Sec 3, 4, & 16, T14S, R15E, G&SRM, Pima County, Arizona (COT) No
U-2022-010 Ward 1, Fiscal Year 2022 Road Repair Rehab Program, Santa Clara Bike Boulevard - Containing 44th Street, 16th Avenue, Aviation Drive, 15th Ave, Alley at Irvington Rd, Nevada Street, 17th Avenue, Nebraska Street, Oregon Drive, Verdugo Avenue, Canada Drive, Santa Clara Avenue, Hawaii Drive, Holladay Drive, Santa Clara Ave, Liberty Bike Boulevard - Containing Santa Clara Avenue, San Fernando Avenue, Santa Paula Street, Fiesta Avenue, San Fernando Road, Located within Sec 26 & 35, T14S, R13E, Sec 2, 11, 12, &13, T15S, R13E, G&SRM, Pima County, Arizona (COT) No
U-2022-009 Andrew Street Bycycle Boulevard - Wilson Avenue to Calle Betelgeux - starting at Wilson Av down Warwick Vista to 24th St to Tucson Bl, then from Tucson Bl down Winchester Vista to 26th St and down 26th St to Winmore Av then down to 27th St, then 27th St to 28th St and then back to 27th St to Alvernon Wy, then down Sylvane Dr to Belevedere Av. then to 26th St and then down 26th St to Swan Rd, then from Swan Rd down Andrew St to Woodland Av to 26th St to Craycroft Rd., the from Craycroft Rd down 26th St to Wilmot Rd., then from Wilmot Rd down Calle Castor ro Calle Betelgeux - (C & R) No
U-2022-008 Offsite Paving Plans for Circle K at The Bridges Sub-Area B-III S Kino Parkway - on Kino Pw just south of Tucson Marketplace Bl - includes new right-turn lane on south-bound Kino Pw and modification to median for left-turn and also includes new curb, sidewalk, ADA Ramps, asphalt, and driveways - (Zell Compnay LLC) Yes
U-2022-007 Road Recovery Proposition 101 Portion of Rehabilitation Package 10 - Cushing Street from Granada Avenue to Stone Avenue - road reconstruction - (Kimley>Horn) NOTE: this was a portion of package 10 that was removed to be built sooner. This portion does not include ADA Ramps. Yes
U-2022-006 9th Avenue, 5th Street, and 9th Street Bicycle Boulevards - Includes Curb Bump-Outs, Traffic Circles, Center Islands, Speed Humps and raised island turn restrictions - 9th Av. from St. Marys Rd to 2nd St, 2nd St to 10th Av., 10th Av to Speedway skip PCC then 10th Av from Drachman St to Adams St, Adams St to 9th Av., 9th Av from Adams to Grant Rd., Castro Av. from Grant Rd to Blacklidge Dr., Blacklidge Dr. from 9th Av to Balboa Av., Balboa Av. from Blacklidge Dr. to Ft. Lowell Rd. - 5th St. from 6th Av. to Euclid Av. - 9th St. from 4th Av to Plumber Av., Plumber Av from 9th St. to 7th St., 7th St. from Plumber to Treat Av. - (Kittleson) No
U-2022-005 Private Underground Electrical Utility Conduit and Easement in Alley Right-of-Way between Waverly Street & Linden Street Just East of 1st Avenue (SolarGain) NOTE: also plan P-2022-002 Yes
U-2022-004 Private Underground Electrical Utility Conduit and Easement in Alley Right-of-Way between Seneca Street & Waverly Street Just East of 1st Avenue (SolarGain) NOTE: also plan P-2022-001 Yes
U-2022-003 University Boulevard - Stone Avenue to 6th Avenue Striping Plan. This was originally submitted by Kimley-Horn as "Bicycle Boulevard Pavement Resurfacing Package 2", Plan U-2021-006. The City of Tucson Traffic Engineering wanted this section restriped to keep the bicycle lanes closer towards the curb. Yes
U-2022-002 Blacklidge Drive Bicycle Boulevard - Oracle Road to Columbus Boulevard - Includes Curb Bump-Outs, Traffic Circles, Center Islands, Speed Humps and BikeHAWKS at Stone Avenue, 1st Avenue, Campbell Avenue, Tucson Boulevard, Country Club Road & Alvernon Way - (Kittleson) Yes
U-2022-001 Temporary Soil Nail and Cantilever Soldier Pile Shoring Plan for Hub-4, Being a Portion of Land Located in Sec 7, T14S, R14E, G&SRM, Pima County, Arizona (Terracon) Yes
U-2021-010 Drexel Road Offsite Improvement Plans - on the South-side of Drexel Rd between Tucson Boulevard and Country Club Road - includes new asphalt, curb, sidewalk, ADA ramps, scuppers, and three driveways - (VLMK Engineering + Design) No
U-2021-009 M. L. King Jr Way At Tucson Marketplace Boulevard Signing And Striping Improvements - changes to striping and signage north of Tucson Market Place Boulevard with the majority of the work on the new private road extending MLK Jr. Way south of Tucson Market Place Bl to Kino Parkway - (Kimley>Horn) No
U-2021-008 Private Underground Electrical Utility Conduit and Easement in Ganley Road Right-of-Way between Tucson Boulevard and Sears Boulevard (2275 E Ganley Road) (Solon) NOTE: also plan P-2021-004 Yes

page 7 of 343