Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

City Logo

Property Research Online

Permit Detail

Status:
FINAL
Address:
Description:
Installation of 365LF of 8-inch CIPP Lining between manholes 9837* 01 and 9837-11. Provide MH rehabilitation and install new collars for manholes 9887-11. A one day 24-hour closure required for manhole collars to cure. Installing terminal manhole at 9837 * 01. ** ABUTTING PROPERTY WILL NEED TO BE NOTIFED OF WORK 10/21/2019-PLAN CHANGE- REMOVE AND REPLACE 21 LF OF 8" SEWER MAIN
Contractors:
  • PROPIPE PROFESSIONAL PIPE SERVICE

Completed Inspections

Completed Inspections - T19RW06337
Status: FINAL
Description: Installation of 365LF of 8-inch CIPP Lining between manholes 9837* 01 and 9837-11. Provide MH rehabilitation and install new collars for manholes 9887-11. A one day 24-hour closure required for manhole collars to cure. Installing terminal manhole at 9837 * 01. ** ABUTTING PROPERTY WILL NEED TO BE NOTIFED OF WORK 10/21/2019-PLAN CHANGE- REMOVE AND REPLACE 21 LF OF 8" SEWER MAIN
Date Type Inspector Inspection Description Results Description Comments
11/07/2019 30400 Bravin TDOT-EXCAV GENERAL INSPECTION Approved Pipe has been relinned and bench work finished in manhole. New concrete collars have been added to the existing MH. no issues or repairs needed in alley.

Documents

File Name Document Type  
T19RW06337.PDF ROW-RIGHT OF WAY VIEW
T19RW06337 R1.PDF ROW-RIGHT OF WAY VIEW