Fees

Fee Schedules

A new restructured fee schedule has been adopted to aid in the implementation of the Tucson Development Center online permitting system. The restructured fee schedule will replace the previous fee schedule located in the Administrative Manual Section 4 on October 31, 2022, to coincide with the launch of the new permitting system. Customers can reference the adopted restructured schedule.

The current rate for Planning & Development Services is $82.50 per hour. After-hours and unscheduled inspection services can be accommodated depending on inspector availability for a minimum two-hour charge.

The fees for excavation permits are located within the City Code, Chapter 25-4.

Fees for Electric and Gas Reconnect permits are $114.50 + $16.50 Digital Filing Fee, which includes the appropriate inspection. Customers must place a gas pressure test on the line prior to inspection of gas lines. Contact your contractor or your local hardware store for the test assembly.

Building Valuation

Buildings are valuated based on Data from the International Code Council.

The City of Tucson utilizes the ICC valuation table provided by the International Code Council to ensure the permit fees charged are equitable to all applicants.

Development Impact Fees

Impact Fee Information (Fees have been collected on permits issued for new commercial and residential construction since July 15, 2005.)

Estimate your impact fees with our online Impact Fee Calculator.